Show Improvements at gym Have been done Much needed improvements have been made to the gymnasium at the Duchesne High School this summer and since the of the current school reports Principal Don H. Improvements include construction of double rows of bleachers on both sides of the gym and painting of these bleachers to match the wall Principal Davis says much better attendance is anticipated at basketball games this season inasmuch as the bleachers will afford an additional seating capacity of at least increasing the gym seating capacity to about The bleachers are arranged so that everyone can The first row of seats are chair 18 inches from the and the back row is 18 inches higher than the front Foot rests arc provided for occupants of the back The high school supervised construction of this and the Duchesne Lions Cub gave them financial The project cost approximately This low expenditure was greatly accountable to the lumber bargain allowed the school by of They delivered some 1600 board feet of planed lumber for Davis Principal Glen the shop Coach Jerry and students have done most of the who have contributed to the project are Charles Jerry Lloyd Lewis arid James Other students also New Glass Bank Boards Glass bank surrounded by steel have been installed in the gym at a cost of approximately Funds for the project were given as by the Indian Agency at by the Duchesne County School and is to come from The district maintenance men have installed the Another improvement that Davis hopes to obtain soon for the gym curtains which may be drawn to serve as blinds when a film or slides are being shown in the Now the windows have to be boarded when light control is Davis says he recommends a plastic or rubberized curtain or non-fade fabrics for the window curtains or The school district made a lot of improvements to the gym this year tile has been Installed in the affording better heat and sound Pastel colors were used in painting the |