Show 0 Street Improvement Projects For 1956 In Duchesne Program Still Unfinished DUCHESNE Six blocks of Duchesne City streets were graveled and oiled as part of the street improvement projects here during reports Wallace J. city councilman in charge of road work The allocation to the city from the state B and C road funds was used in this improvement No increase was made in the mileage of streets within the city limits the past In the opening of several streets was a part of the street improvement program outlined by the city Stephenson Near Courthouse The improvement work the past year was on the block west of the courthouse to the ranger station which was an extension of the oil surface on that one block north of main street into the side of the Duchesne Motor Co and the school district maintenance completed as a cooperative project by the city and school two blocks north from Highway 40 traversing the east property line of the elementary school two blocks beginning at the northwest intersection at the high thence east to the Blue Bench from Highway 40 at the intersection at the Troy Bailey south two The project outlined by the city last year has not been The street improvement is expected to be continued to cover the block in front of the Tatton Bench home o the Indian Canyon and possibly other connecting streets if funds arc not depicted before such projects are |