Show School Remodeling Plans For Duchesne Given Look fi y kl Ji COMPLETES MISSION Elder Val Timothy has completed a mission to the Central States and has returned Schematics prepared by the architects for the new construction and remodeling at the Duchesne High School have been approved by the Utah State Board of Education and by the Duchesne County Board of reports Supt Rowan C The local board's approval was given at their January 10 Cannon Salt Lake City have been authorized and directed to proceed with the preliminary drawings and es for the The schematics are similar to the proposed plan presented to the public last which provides for a future Included in the project will be a new boiler room to be built where the present boiler room is located A proposed large addition to the north of the existing high school building will include a new administration science dressing and shower facilities for the future gymnasium new dressing rooms arc somewhat remote from the present but are located thusly to facilitate the best possible plan for a future Stutz is felt that inconvenience of location of the new dressing rooms is more than offset by the ultimate advantages they will offer when the new gym lis he The total project will include square feet of new on SCHOOL REMODELING from page The proposed remodelling to the present building will include improvement of existing toilet rooms and making an art room where the present library and typing room is located Some will be done in the present gymnasium and music Tentative plans call for a March bid on the Allocation of funds under the state school building program totals which al lows for for new and for |