Show City Building Takes On Beauty as Brick Work Progresses N. A. Boys at Work on City Project The brick work now underway on the new Roosevelt city building is adding much to its fine exterior walls of building are being brick-veneered and cement-pressed buff-colored bricks to match the hospital are being W. Russel N. A. construction that bricks Would be used to complete the The attractive front entrance to the building is cast A ribbon strip of cast stone is being used at window height and a cast stone coping seals the brick work at the top of the When the brick and stone work are the interior will be plumbing will be installed and finishing work such as window and door will be The roof has been Todd It consists oi 6 of tar feit laid in hot asphalt and covered with fine pea Interior Plan The building houses a 18 32 located in the south wing made and light by 1 three large windows on the south and one on the A small work room for the librarian's use adjoins the A six foot corridor leads from the entrance of the building to the city office which faces This room is 16 by 18 feet and contains three large windows on the A built-in concrete 5 by is located in the In-addition to the city office there are 2 other one 10 M by 10 the other by 15 which are to be as office Both are located in the front of the building and contain windows opening on the On the extreme north of the building is the fire station which will house the city's fire truck and This room measures 32 by 16 and is entered by a 10 by 10 overhead There are two lavatories and four closets In the building convenient to the offices and In the basement are found the furnace and coal Thirty-six N. A. boys are employed on the building in addition to the supervisor and one professional brick The N. A. boys work in three 50 hours each every six |