| Show MAJOR ADDITIONS TO OGDEN ORDNANCE DEPOT OGDEN utah major additions costing about and include ng 72 buildings and numerous otili ses lies will be placed under contract here before july 1 for construction ot a large 37 millimeter shell loading plant at ogden ordnance depot a announces In ounces lieutenant colonel elmer G thomas constructing i bermaster master ler er for ogden and vicinity when completed the new units will vill employ at least 1000 persons it is estimated in addition to about persons expected to be employed at the present units which consist of buildings most of which are now virtually completed the following units will be placed under contract this month said lieutenant colon bl thomas elthomas additional 37 millimeter shell loading line of 28 buildings additional fuse loading leading line of 14 buildings primer I 1 line irie of 18 buildings a two story administration building an inert material if rial storage building 10 igloo type underground magazines and a gallon water reservoir in addition contracts will be let during june for eight miles of rail load track a water system boiler ard and compressor air conditioning system roads fence storm sewer system sewage disposal facilities sidewalks ride i walks construction equipment and other items bids on the boiler and air compres tor sor including materials and construction st tr will be opened june 20 at 1130 a m at the constructing quartermasters west second street office in ogden bids for construction of the 10 magazines will be opened june 23 at eleven thirty a m bids on a large quantity of rails rail accessories and railroad ties will be opened june 23 at two p m bido bid on en the construction of reinforced concrete roads and sidewalks will be opened june 24 at eleven a in bids on construction of a chain link boundary fence will be opened juno juni 2 24 at eleven thirty a m bids on a railroad track weighing scale will be opened june 23 at eleven a m dates of other bid openings will be announced in the immediate future |