Show works progress administrations tangible res results tilts of the works progress administration program in utah and other states over the nation during the past year wore were ont outlined lined saturday arday in in a report received by mien allen T sanford utah director national emergency council from washington D 0 salient features of the report were that unemployed were put to work HiO in farm to market road projects to provide better roads for farmers are under construction school buildings have been built or repaired other public buildings erected or repaired parks and playgrounds con 6 or improved water and sewer systems built or repaired flood and erosion control projects tire are under cont construction ruction airport projects are in operation electric systems have been installed or repaired high school and college stu dents have received financial filanc ial to make possible continuation or oc their studies projects of all types have bave been conducted over the country fol four ir of every five dolias have gone directly into workers wages mr sinford said after examining the report local lacal governing bodies contributed 10 19 per cent or almost of the value of the projects selected for om operation ration more than highway hig hwai road and street pro prow joet ts valued at 4 and providing more than 93 man hours of work per month or 41 per c ent cent of the total have teen een selected for op operation aeration era tion the report set forth corth |