Show SPLENDID PIECE OF WORK that is the verdict on the piute diute tunnel contractors and boarding house keepers praised the which has been driven at site of the pietr is i said to be one of the finest pieces of work that has been done in this part of the country driving darivin from both sides the meeting was effected ard th nills ills IN were ere a aa even as though ane work had been all done from one side nelson agard and Jers had a force of men employed w who 0 w well ell understood under tood the driving of tunnels ahe machines used viche ere the regular coil coal machines which were found to bo be well adapted for drilling the hols there were sederal breaks ertta in the rock and alece tt ece pla es will be cemented in fact there will be consi drible cement work done in the approaches and tunnel before the water is convened on eed ti rough it mr and mrs joseph joeph nelson arjo conducted the boarding house for the men employed employ d at the tunnel have earned the highet praise from flom the men for the excellent table and othar ae ac a furnished the men the wor workmen kniel all swear b mrs airs nelson as the greatest cook that el eer er happened mr nelson is looked upon as a prince by his employees if lie takes another contract the fellows who hae been at work for him will fall oi oer er themselves to get on the job on the site bite of the an engi engineer beer and some workmen are busily encased digging experiment pits the soil from these pits is carefully sieved and tested for the qualities which will decide their fitness for use in the dam |