Show DRAGGING THE POAD the use ure of I 1 ie ic log drag again ern em pha sized I 1 llie he ie L i i still sim li d ludo as li ILL rut lit dnn length 10 1 lo e ol of 0 alln ceol oil oi i ill alir ailts lilts nit tylnn tile flost is c nin in out IWI all fill 1111 till tile the hollo sit ill oil oh oft the humps and ami nuke make i 4 bid bd uil lad gissible I 1 pis ass ible sible I 1 tic drig i is inide a as lolo 1010 s rhe I 1 0 of t split it los log i 1 I a ft fot to lu atu to 1 1 in thick set oil nn edge 0 i 1 i 1 judit apai t both lut ilat sides ides to lo tile the front S ion i ak ah or hedge it dge hars bare b 1 li the lie ends nd of if ate aie cd ceJ in trio nali let aiice holes belld thio I 1 0 ne nc of log drag tbt tb slabs dotted line chain or strong win will U D dl DI rai gs s to connect doubli douba atiee clevis mich hitch at U D and stand at C on a lud on oil the crosh cros jis lei in iv iN bolh oik at ill 01 aul aud f nd ind at 1 fc afi i ditch clean ing ui oi to tit it 11 ke e tho ilia dia throw more alit to th I 1 rt to nack mo e ditt dill to the right ieves position of drnec and ilitch hitch if aking a ell cl i or gilo gumbo ilyo road pat non loin old od wacil tile hie or something 1 cl I the sort on gonei edge edae of di dug ag it 11 end till of six sit months foo foi soft er soil at ll it I 1 ad ol of 12 months |