Show ROA ROADWORK DWORKIN IN SEVIER COUNTY 23 25 per cent of paving south of richfield done salina redmond pavement open tor for traffic the laying of the pavement south ot of richfield as progressing nicely and at the present time 25 per cent of the total of 1 miles to be laid is 13 finished in about a month the work will be completed the three miles leading from salina to redmond are finished and the last stretch of it was opened tor for traffic wednesday after the state road commissioners had heard complaints of the people or of central and sigurd regarding routing the new road so that the two towns are not met hy by it the commes slon ordered a new survey which is being taken now and will be routed through sigurd as well as central when the survey la Is completed which will be in the very near future the engineer of the federal bureau of public roads will come down to approve it and it if it meets with approval I 1 bids tor for contracts will be advertised so that actual work on the gravel surfaced road from elsinore so salina can commence about september 1 |