Show fit A tea ON AGE ROAD SOUTH 0 TOWN force of men to ground draining and Cul erts South lof assistant chief engineer H 6 kerr of the state road commission passed through richfield saturday on his way to the gravel deposits near marysvale Marys vale and while here reported pleasant news regarding the road work in sevier county the switch and rail arrangements at the salina depot are completed and the contractors gray and murdock murdoch of 0 salt lake city have the road machinery partly on the ground and partly on the way gravel shipments will arrive immediately immediate lv and work will be under way by the end of the week from gunnison to the county line and from there to redmond on the crushed rock surface road and on the hard surface from redmond through salina engineer gillis will be the road commissions superintending super intending engineer and while the paving is going on engineer erickson as the commissions resident engineer will commence work on survey and location of the salina richfield road which will be gravel surfaced on the repeatedly mentioned two stage plan the c contractors 0 ti act r will work from north to south and while the work is going on from the county line south to and through salina a force of their men will be delegated to richfield Richtie ld to work on the one and one halt half miles to be paved from richfield south and adjoining the city payment ment they will prepare the grade drains and culverts cu lverts so the hard surfacing can be done in time to make the road available when the hauling ot of beets will be on |