Show Builders Gain At Hill Utah subcontractors are earning their share or the million allocated for the construction of a new hospital on Hill Air Force A SURVEY of subcontracts let by the main Sante Fe Engineers of reveals that nearly 75 percent of all subcontracts have gone to Utah firms and most of those are located either in Salt Lake City or the northern part of the Most of the out-of-state contractors are contributing items such as X-ray steel food service equipment and other items not readily available in HOWEVER local companies are doing about percent of the construction work including the electrical landscaping and interior The only two Sante Fe employees sent in by the contracting firm are the project supervisor and a quality control LOT of people get the mistaken idea that when our company is awarded the all of the construction dollar is lost to that explained project supervisor Don Carroll and I are the only men on the job not on local quality control reported that the medical facility is nearly 80 percent complete and slightly ahead of schedule with the bulk of the winter already The square foot facility is expected to be completed In the hospital will house 45 beds and a broad range of services to replace the world war II vin tage buildings that have served as a base complex for many THE FACILITIES will include a dental modern operating a a staff offices and an outpatient Local firms with major subcontracts include Anderson mill and Fixture of Cache Valley Electric of of and Allied Sheet Metal and Higham Hilton both of Salt Lake |