OCR Text |
Show ROAD COST REVEALED. During tho three years that the Cnstlo Onto to Diiohosno highway ha been in epurso of construction, which includes surveying, engineering, supervision sup-ervision and equipment, oxiienditurt'i to May 1st, uggrognted $253,(03.30. When tho work began the oatiimited cost was $131,132. Included in the oxponso is n chnrgo of $2,108.01 for romoving winw frem Dccembor, 1011), lo March, 1020. Thoao figure are contained in ft letter from Secretary of State Harden Iiennlon to tho My-ton My-ton Froo Press, which renuoatcd information in-formation on tho BiibjccL During tho samo period tho expense on tho Prico to Myton road on account of construction construc-tion and maintenance in Carbon and Duchostio counties was $58,034. |