OCR Text |
Show SURVEY TO START. Kvideiuu Hint tho goveruiueut in-tends in-tends to begin immediate ehiMiiieu-Hon ehiMiiieu-Hon of water poworsitos under tho new wntur power bill is t annulled bv the visit of II, W. Diiwnport, engineer en-gineer of the power division of the land elnssifientinu board nt Washington, Washing-ton, I). C, who is expected to be here Jul) -1th. He will ooufrr with It. It. Woolluy of thu Utah water resources branch of the geological survey, lit is making a genoinl torn of thu United Unit-ed States. |