Show Library Bids High Davis County Commission has really felt the pinch of A RECENT bid opening for construction of the North Davis Library in Clearfield was some over the architect's This nearly 25 percent above the estimated finds the county short of begin checking every including help from the State Library to find additional said Commission Chairman Stanley M. THE APPARENT low bid was for submitted by John DeYoung Construction Larry library had estimated the cost of the new building at The DeYoung bid was one of three offered at the bid The low base bid was but did not include alternate costs for finishing an assembly a sound a fire-preventive sprinkling flag drive-up drop and a bicycle OTHER LOW base not including were Ron Stacy and Lee Sanders Construction Davis Commission suggested that the cost be reduced somewhat by eliminating some alternate taking out the and generally reevaluating the cost of some SOUTH DAVIS Library in Bountiful was bid in 1968 for essentially the same construction and built by the same construction company for lb |