Show henrieville HENRI EVILLE I 1 CAMP NEWS 1 Nume numerous roub construction projects atre under way at the Henr leville camp which will aid substantially in improving the camp improvements now under way or being contemplated include the construction and placing ofner of BOW fire ladders on the roofs and sides of all the buildings additional space apace added to the wash and shower house abi which ch will be e used used tor for a new lit laundry room and a barei barber shop the major project now under way away is the construction of a new division pt grazing office which when completed will enable the use of the 66 space now being used as office for much needed additional room for educational purposes purposes the work is being done entirely by enrollees who are under thi the supervision of meat ralph N haryey harvey commanding officer who Is assisted by mr diris educational advisor theldred holman senior fo foreman remann and elmo smith leader this tipe of work provides opportunity to train interested enrollees rol ices in construction construction of bf various types particularly carpentry satisfactory is factory ie results i aults are achieved in I 1 pis this way which are of benefit both boil to the ca camp and tho those se participating MP in the lie work |