Show NOTICE TO contractors cox TRAcToRs sealed proposals will be received by the state road commission of utah state capitol salt lake city utah until 2 p m wednesday august 2 1944 and at th that at time publicly opened for construction of a road mix bituminous surface road in iron county the same being that section of state route no between cedar city and iron mountain identified as DARM DA RM project no 38 33 1 the length of the road to be constructed ted or improved is miles and the principal items of work are approximately as follows gals bituminous material cu ads crushed rock or crushed gravel surface course furnished in stockpile the attention of the bidders is directed to the special provisions covering subletting sub letting or assigning the contrael contract the minimum wage paid to all skilled labor employed on this contract shall be 90 cents per hour the minimum wage paid to all intermediate termed ter late labor employed on this contract shall be 70 cents per hour the minimum wage paid to all unskilled labor employed on this contract shall be 60 cents per hour the attention of bidders is is directed du lt to the fact that this commission has been advised by the wage and anc hour division U S department of ol 01 labor that contractors engaged in highway construction work are required to meet the provisions of the fair labor standard acts of 1938 52 stat 1060 plans and specifications are on I 1 file in the office of the state road commission salt lake city and the office of its district engineer at cedar city utah where they may may be reviewed by prospective bidders specifications proposal forms and plans will be furnished at salt take lake city aty on depositing which will be refunded providing bidder sub submits an acceptable ibid bid and returns the plans within seven days after the opening of bids each bidder must submit a letter from an approved surety company guaranteeing to furnish said bidder with required bond the right to reject any or all bids is reserved cash certified check cashiers check or approved proposal guaranty bond for not less than 5 of total amount of bid made payable to the state road commission must accompany each ibid bid as evidence of good faith and a guarantee thit that if awarded the contract the bidder will execute the contract and furnish contract bond as required any additional information may be secured at the office of the state road commission dated that day of july 1944 state road commission of utah by john S evans chairman |