Show SUMMIT CANYON DRY FLAT ROAD FINISHED the crew directed by county road supervisor J clair platt which has spent most of the summer on the summit canyon dry lakes bear flat road finished operations erat ions on those roads the first firs 0 ol 01 the week the road which was built primarily as a means for livestock men to get to their ranges has opened up one of the most scenic loops in this sections section though the road first class being rough and steep principally in the summit canyon it is more than passable the entire loop can be driven in a little over two hours by starting in par owan canyon and coming down the summit side motorists who intend making ane anc loop should leave the parowan carowan main canyon road just above customs going up through dry lakes and intersecting the bear flat take off just east of the sugar loaf at what is known as lowes balley bailey from there the road goes along the south side of the sugar loaf to the base of eagle peak and from there until the lower part of summit mt is reached the road follows generally the stock driveway finc ariy riy ly leaving that to drop abruptly into nto summit canyon and intersect ting ng highway 91 just east of summit mit |