Show I 1 REPAIRS ON NAVAJO LAKE DIKE BEING MADE repairs on the dike at navajo lake jake are being made this week by enrollees of the duck creek COMP camp it is expected that by the end of the week most of the work will be completed and the waters of the lake will again be impounded before they reach the porous lava formation at the north end of the I 1 lake the dike which was constructed a year ago broke early this spring and released the waters impounded by it the break was caused by a clogged spillway and about abou t felt feet of the dike was washed out lowering the water level of the lake about I 1 six f fet et |