Show WORK ON OH STAKE TEMPLE COTTAGE the B D jhc pr acs ward nvard clerks and high council members of the par owan stake to the number of 0 about 60 50 spent wednesday in st george where they worked on the parowan carowan stake unit of the temple court which is ia being constructed there two truck loads ot ol ina teral were taken from here with the same being taken from other wards in the stake quite a lot was accomplished by the group during the day although it rained on ithem most of the aftel noon the thai ground wets wa cleared trenches dug for or the foun oun daton datoli and quite a bit of cement run in before babore time to quit and come home other days amilar sr to this one will bo be held in the near ear future |