Show WORK TO COMMENCE ON BOWERY ROAD SOON dixie national forest supervisor dlaine bettenson who with mr orange olsen former supervisor was here during the recent fair bair stated that part 0 of the machinery hall had arrived to bo be usel used in improving the bowery road in our second lett left hand canyon and that work on that road and the one to vermilion castle camp in ahe other canyon Is to commence at an all nearly date approximately Is available for or this work as we retail recall it the road to the forest camp Is to be double tracked and a new bridge put in improvements on the bowery road are to include flattening some ot of the curves and grades |