Show work to start on brick for seminary monday next monday morning a crew ot of men will s tart start work making brick for the new parowan carowan seminary building to le be erected this summer on tho the site 0 of the rex C ward home mr fr andrew rollo or cedar city has brought his brick making machine over from that place and he with local men are at work now getting the yard and machines ready to commence work monday morning mr air rollo hollo will be supervisor of 0 this work and tile the brick will be made as fast as possible to bo be ready as soon as the contract Is let tor for the building and the contractor ready tor for thern them they are being made out at buckhorn where the desired material Is to be found the wood for burning the brick Is already on oil the ground there having been hauled early this spring the two wards here are making the brick to sell to the contractor and arc preparing to make of which will be needed for the building A kiln 0 of lime is ready for burning at the old kiln in the mouth ot of the canyon this also to be used in the construction of the building we understand that the contract tor for the building aasne been let as yet although bids were called caled for and opened sometime ago when the bids were opened the lowest bid was approximately higher than the called tor for in the plans as prepared by the architect in the meantime the two wards here are going ahead with preparations tor for their pirt ot of the building program so as to le io ready when the contract is let rut out |