Show COUNTY commissioners STAGGERED BY PAVING ESTIMATE FIGURES cedar portion estimated at countes Coun tys at ly ryO lievy auks anks for 1000 for eft fand roami figures presented to the counts connie C boners t at their regi regu ilai lair meeting on monday ast in 10 the for form ot of a ort co operative Pu tv agreement for far federal aid project no 78 chib jr involves olves the paving of cedar city s main street figurative figura li stag gitig geleda the atheni the had fr from previous loci locharles arles that the C county latys s portion odthe of the to cost of that her job would be between bat t ten a and twelve thousand dollars and ad a so figures in the cooperative ariee treat estimating the total cost at more than two tl busand with b the file county an ty s p portion tant minum more tion than t twenty nty thousand were em is bat disco discovering cering h the county hooded almost to 1 the I limit hal ild and its citizens generally generd ll or in ral no arras of f into annd for arditi I burden with tx tax anticipation at gatior bonds bond already issued on this year s taxes to the talent extent of 60 and burel barel enough money in a the road funds tc t meet at present off obligations lations and main cast coats tor far the year the were facing a real mat problem to raise the estimated 10 to double that amount art looks like on one oath of the bill to the them their dilemma was not flot lessened ans in either when corn commissioner mission er savy y asked for an appropriation fur the roads 1 jn the west abat end ad of the L anti at wa winch 1 be stated t ed were a almost oa t ad impassable he to made a a motion that a an appropriation of OUO be ampro printed from the first bonev avail I 1 III ible e ft for those toads road supporting it with athe the statement that he was ran not in fa favor of spending till all the county unity road it money in one a section euion and ad rel neg it electing ting tb the balance ot of the rodi though IT his court motion loor received no ni sec to uld mid it suggested tint ante a cour promise night be C Af floon took the ald thit because this may mav be tire the last chance to get I 1 ederae aid for paving ledat main street on accost jf f the possibility of federal aid being discontinued and the pros hect of edda t a exceeding the pop ola illation tiona limit hout of everything should be sidestep sidestepped ed this year in tir t ir of that project chairman adams expressed a similar view but just how bow to raise the county a por par fr tion of the cost was his chief on i ern some honie modification of faba the figures figure in the cooperative agreement agree menti wa wab found f in na a letter from the hie assistant an gainder ans ineer which is reproduced here with but the signing of the agree ment as deferred until the mut macei adam it f L ledr e city aty A portion of the cost cosit estimated bv be the engineer eri at t ia 0 could old be with wilh cedar C ii officials f he not T the a alar t er engineer s letter referred refe bened ried to foll offs jr jin if 21 memoranda memorandum T to H henn W lunt lou CT raine building Buil det de T but F A P 17 no 75 cad cedar cu cita PAY in reference elcree el cree IB made to looban I 1 five agreement terent recently lY sent to the 1 iron commissioners commissioner fr for the c in sl rit ruction of tins tills project A As oi understand tod a agree mem I 1 is nothing more thu than a rough aal go cups of the cost of the work to be done and in mos most t cases is made up before even the survey in made from which sett actual I 1 ad le lengths on slid aud wid width t in at are e 0 ob b tamed this thin Is the fact in thi in accordance with your request fr from mom inra ism accurate is alf in furi nation tom which I 1 had bad in a my mv possession I 1 reviewed ill the alt estimate as A P prepared to p red at and from fr which b h the fit cooperate coo per e agreement was based it is 11 my opinion that the federal aid pc portion tc of the chih b the way is feet long and 18 fr fl wide should be estt estimated d at 44 which for far tin the 1 give approximately 39 per mile it the maximum maci an anto federal all aid which is wi can an obtain ill u is 22 26 per mie or of for ihal in miles 1 vo anatal tal federal aid ad of 25 till thus ca led 1 f r am 44 0 on gives 18 Z 00 as an a estimate of the counts a portion ja 26 per cut cent of the 14 14 is up ap proximately 11 A so the is will 11 be obliged to furnish app approve 1 it 7 more inore th thin the reg ul abar ratio this being due of course 0 the or maximum trun limit annit of federl federal aid nd pet per mile specified by Is law also albo bahe I 1 on a mma ai rate I 1 in fr nr mation ali which I 1 had in ni Ps pis se session oll the linvs city h is ia sn noted by no mp to cost as W his includes I 1 r I 1 a dues complete com piete biving p mg and ad got gutter at the beeco re eco at each end of t the tie full width section seel ion 44 plus 35 ono c a for total 0 of f 79 ono a as a tough esti bite fit fir hiss h entire L of hueth the loul hd j unda world ca 1 it b be 5 53 3 7 0 0 this I 1 w th he sum I 1 w which int should I 1 old be used at laiu ot 1 be 64 71 stipulated tp d in the cooperative at alln agreement geu as tl the bounty oty s i and ad I 1 cit it i portion of the hit work it will w 1 t a not f b be known w whit b the actual rost oat will be of the p project until the bids bibb are am received and 1 I of ce these at to timea 10 and more respectfully suba eted arta k kir vhf n 91 IT |