Show city officials decide on I 1 I 1 big light plant W will i I 1 I 1 d develop e v e I 1 0 p 4 4 0 H Ho 0 r s e p 0 v e with 16 second feet of water with 24 second f H t co t abo t bd for mati mat i iala celled F r january 5 from seven distinct propositions s li ini a lb cidro dro electric power and bigl t pl p int submitted by engineer ro hk lcy at a special session of the cay C council on oil flonc ay night the one d it aided upon as best filling the needs 01 ol this comm community unit y will develop dev elip 40 h with a 16 second fo t flaw of water or with a 24 sec d foot flow and will cost if all n diw L W ina material teral is used about or exclusive of the cost of r constructing the distribution ten the plant will be located at what is ia locally known as the second mill mid site sib and the pipe line will extend fr in the junction of the first left hid and main alain canon can on streams div in a ft foot f t head estimates of the pipe in place which will willbe be 26 24 2 i arid and 22 inch pipe and about two t girels of it wood are in the vicinity vici city rity of while the new water W tt eel dynamo and other machinery a I 1 equipment are estimated to run a about these estimate dir considerably higher than pit pie v us is ones given the advance bei ig d u mainly to the fact that there a much duch fall or eras as much head cant b bi developed RS as was figured in us estimates with only available fot for plant the city is calling for bids 1 s r furnishing famishing the material in the h b ie e that those estimates may be sl ded sufficiently to come i I 1 amount available another alternative which is bei f seriously considered is tho the purt puri tse iseff of the plant which brigham v y has for sale and which has been c inspected by city officials d r 0 report that it is in excellent con 0 cai on though it is several years old I 1 s plant can be purchased ed for V 1 nut alt which baeb would make the c t come within the amount int aceil in i ids for the furnishing of the pipe i r chinery ete etc will be opened on i uary esth at the last meeting of i ir present council but contracts I 1 probably pio bably not be awarded until er the new officials assume office the sti te s for a plan of horse I 1 ver capacity lan ion about f J i i incoming mayor ind and ti the ne new i ibbers of the cit city v cot council Coin cicil cil 1 ilas les and marsden were f the tre meeting eting on monday right eight ahon lin li n the liopo were submit I 1 |