| Show NOW IN 1200 FEET FEEL workmen on an day adams re eter vear tunnel making good headway in an inter bew with H L adams adama it was waa learned that the workmen on the day adams reservoir ReBer voir tunnel at the yankee meadow are making excellent progress and they now have the tunnel in 2200 1200 feet which means that but feet more has t to be dr driven dra a at present the workmen are in a hard formation of conglomerate which has slowed down the work a trifle within a few days daya this thia for mation will have been driven through after which it is expected that the formation will be much easier handled five to eight feet of tunneling per day is the record now being in made ade and if this thia speed ea can be maintained the tunnel will be completed and water running through early enough this year for the irrigation season |