Show Francis Water System Nears Completion FRANCISA FRANCIS FRANCIS- A waterworks system to give Francis piped water into their homes J for the first time Is nearing nearing near near- ing completion date of Aug 27 The Area Development project got under way May 15 according to toA toA toA A D. D Prescott chairman of the water board Cost of the project was with the town receiving a 0 federal grant from Community facilities fa fa- duties Administration of A matching fund was raised through a general obligation bond election Method of repayment will be through an mill 8 tax levy and a monthly water fee of 5 al J receive its water from a spring south of Woodland nd It has a flow line of feet Seven Se miles of pipe line has b n laid from the source carried In 6 inch pipe A house head with distribution system and storage tank has been built feet above the town east cast of Francis The storage tank will hold gallons Contractor is Kaley and Gilson of of Salt Lake Lakes Their bid was for Engineer is Art V. V Max Maxwell Maxwell Maxwell well of Salt Lake Lakes |