Show Diversion Dam Built at Ranch Construction of a new dam on the tho Claudius Toone ranch In lA Lost t Creek Crock Canyon is Ja completed and Claude has irrigation for tor 37 acres more pasture land Alva Rust and his sons participated participated in the construction of ot the dam with the tho Agricultural Stabilization Sta Conservation Service sharing charing the cost Mr Toone moved the tho channel of Lost Creek cleared away dense brush built a diversion dam put 37 acres of former Into pasture installed a a. a pipeline feet teet long with two different sets Bets I of of troughs for tor livestock and set setup setup setup up a careful crop rotation program pro pro- I gram gram all all at a cost of 2452 and andI about man hours i i 1 I Mr Rust irrigates 20 acres from the canal which is Ja diverted from 1 I tho dam Ithe I |