Show Kamas Forging To Front Says the Wasatch Wave Kamas will take Its place as one of the tho most mod mod- modern modern modera ern era smaller communities In the tho state stat this fall when It completes three pro pro- projects projects projects that will give It sidewalks curb and gutters and an oiled main street for five and one half blocks Mayor SisSon Hatch reports work will begin soon on the W V P A curb and gutter project now about three fifths com corn d. d The project calls for tor feet of curb and Iud gutter or linear feet along both sides of or main street A separate W V P A sidewalk project will wUl be started following completion of ot the curb and gutter to build feet reet of match match- matchIng Ing log sidewalk extending along main street for tot feet on both sides or five and one-half one blocks The state s ate road rond commission will wilt oil main street reet from curb to curb this summer for feet teet matching the curb and sidewalk project Materials Material are now on hand Mayor Hatch said for or the drainage systems across main street which tho the state road commission Is constructing They will ill tie in with tho the curb and gUtter glitter s system and provide drainage d across acroSS the road rood under main str tr t at each intersection |