Show water system finished mayor gibbons with his entire official f family am ily visited the plant of the new water system last saturday on a trip of final the new system which will pump water into the present city reservoir from water owned by the city from the spiro tunnel consists of a gallon pump connected to a hoi horsepower motor lifting the water feet through 10 inch steel pipe to a galo gallon u storage reservoir ser voir teet feet from the pump the unit Is of the full automatic type being controlled by float switches the construction work on the new unit was done by local labor exclusively relieving tho the local unemployment situation the work wore was in charge of city engineer berl ben H beveridge Beverl dge and fire chief W J berry under the direct supervision of mayor A J gibbons cost of the complete installation is the greater part of which was obtained by a special loan extending over 10 years the inauguration of this new plant will not impose any additional expense pe rise upon the citizens the loan will sill be written off with the revenue derived from the present water rents according to mayor gibbons |