Show new ventilation an and u heat at american the felt williams derrah co I 1 contractors contractor rs of salt lake city are now installing install ng the new ventilating and heating system at the american theater the plant is to be the most modern and efficient used in theater construction at the present day and has been approved by and under I 1 the seal ot of the state board of 0 health com compiling pling with nith their most rigid rulings and requirements p pertaining erta ining to I 1 the health and comfort of 0 theatre audiences I 1 an immense circular fan is to draw fresh air from above the roof line nine thousand cubic feet per minute I 1 forcing it over a battery of two furnaces and into the theatre proper this amount of air will change and replace the entire cubical contents oi of the building every three thre minutes and during the summer time supplying pure fresh and cool air at all times to accommodate the most crowded attendances and the winter the same pure fresh air heated to sixty five or seventy degrees I 1 one ot of the fur farnaues would heat a building twice the size of the american theatre however in bringing cubic feet of new and cold air into the building per minute te the two furnaces are required to heat to proper poper temperature the state slate board ot of health are demanding that all theatres theartres the atres comply ith the law and the tin ater Is one of 0 the first to fall all in liue line although many theatris thea teis ar I 1 fighting this ruling the improvement in comfort and to theater patrons will be immense and should make the I 1 american the coolest place in town during the summer months and fe most comfortable during the winter the plant should tie be ready fo for r operation sunday and the american Americ atil mana aument is to be complimented on their willingness and desire to give their patrons the most in comfort f rt couve convenience and service |