Show RAILROAD NOTES the union pacific his commenced the work of replacing all of its frame bridges now in ime on the wyoming division with steel structures and by the end of the season there will not be a frame bridge on the union pacific II 11 D steart engineer for ahns peak pacific railroad has left with a corps of surveyor to set tho grado stakes for the last five miles of the road into centennial wyo the first dision terminal the road to nial vill be completed before the end of july C F dickinson chief clerk in the union pacific company store department at rawlins resigned his position june ast 1st he is succeeded by 0 K adcock of cheyenne who vent to itaw ling last week sir will visit at his home in evanston Eva naton after which he will take a trip to the cast J F canady for many years engineer on this division of the southern pacific has resigned and left for tau oal to tike an engine on the road running north from that city mrs canady will remain at ca as the guest of sirs K A stander for a few days before joining her aua band at their new home |