Show I North Salt lake Council Road Surfacing a U SI Final decision was made on the resurfacing status of oC the Hillside Garden roads by the North Salt Lake council Monday Monday Mon Mon- da day evening MR i TONGE TONGS announced the councils council's decision to turn the job of patching the roads over overto overto overto to the South Davis Sewer Dis Dis- After Arter studying the condition condi tion lion of or the Hillside Garden roads the road rond committee felt this would be more advantageous to the city These roads were in good condition as were others before the sewer district started the work In digging the trenches the sewer district contractors displaced half haIr the road area aren leaving a much wider wid wId- er surface area to be repaired than in other areas The sewer district had proposed to pay the cit city for the resurfacing resurfacing ing ing of or these roads It was estimated that the patch work on the Hillside Gardens roads would not be completed for Cor some time as the sewer district is considerably considerably consider consider- ably l behind schedule on the road work in other areas IT WAS ALSO reported that the Utah State Road Commission Commission Commission Commis Commis- sion has announced its intention to move into the reconstruction of or the Orchard Drive between the Highway 89 turnoff to Cudahy Cudahy Cudahy Cud- Cud Lane Besides widening and repairing Orchard Drive the contour of the road will be changed They will lower the presently present present- ly constructed gutter to conform conform con con- form with the new lowered contour At present the work is being held up awaiting better better better bet bet- ter weather conditions as well as waiting wailing for the sewer dis- dis n et lowering the two manholes manholes man man- holes on Orchard Drive THIS TIllS ORCHARD Drive job has been let to Gibbons and Reed Construction Company Along with this job this com coin compa company pa parry pany will also do the work on the apron into Hillside Hillside Hillside Hill Hill- side Gardens off Orchard Drive Funds to finance the construction of or the aprons were placed in escrow last Januar January when Lauren Gibbs was was was- released from his bond covering the Hillside Garden subdivision I 1 Councilman Tonge also asked approval to change the plans to resurface Main Street with plant mix rather than using road mix He explained that plant mix was of much better quality and the additional cost was well worth using it The Main Mam Street resurfacing job had been let to the Utah As As- Construction Company of he heis heis Tonge said Bountiful Mr 11 that this new com com- company confident is job excellent r will do an pany ny p Sta This work on Main Street is iso due duet to o start immediately also explained the Mr Dh R Tonge road committee desires to apply apply ap- ap ply a seal coat to all North Salt Lake roads within the next two or three years nv rw |