Show THE LAST and the pipe is now beady for water completion of the pipe line of the pioneer electric power company everything now ready for business at precisely yesterday afternoon the last rivet in the pipe connecting the alve mile pipe line from the reservoir to power honeo ot the pioneer electric power company was driven and the only necessary to generate power is the turning into the mammoth pipe line of the water work has been continued on this great enterprise for almost three years now and at last the completion ie at band all day yesterday yeste aday there was a feeling of expectancy and of keen satisfaction nt the nearness of the closing boars of great work and engineer bannister and many others of the officials ol 01 the company were out at the scene during the afternoon As pach rivet waa placed in position at the las joint it was closely watched ana finally the signal was given that the end had come but forone more rivet engineer banniger Ban iickey up a rivet climbed down into the pit where the connection wag being made superintendent of construction geo thompson WEB already to deliver the blows to complete the unal connection mr bannister placed the rivet in position and bupt supt thompson drove it home and riveted it thus making the pipe line and connections complete and ready for the vast volume of water abich ft ill generate the power or years to come but a few more days will elapse before the water is turned into the pipe and during the intervening will be a general overhauling oi all the machinery and a placing in proper condition of all the escapes gates etc |