Show UPON board of education award contracts for repairs on gordon academy the board of education rushed through a batch of accumulated business at a lively rate at a special meeting held last night bids for the carpenter work and necessary repairs on the old gordon academy to render it suitable for school purposes were opened and considered those who offered bide were ae follows H berry 00 R shepard 00 wm 00 J A Whet meyer 00 A J anderson 00 TJ Newton 0 ingebretsen Ingebr etzen 00 OM flewelling FIe welling mr bid being the lowest he was awarded the contract and in strutted ted to proceed a once with the work in accordance with the plans and specifications of the architect then came the consideration 0 bide for water closets and sewer connections this was to miles strevell and ulmer with the instruction to have their work completed within chirt days their bid was 1365 A number of bids were received and opened for the repairs on the steam heating and ventilating apparatus they were all rejected and new bids were called for |