| Show THE CANON BRIDGE bounty commissioners accept the bridge from contractors tie county ye accepted floru the contractors andrews bros the new teel bridge at abo mouth of the canyon the old bridge wan not one bitable ui table to the location and was damaged duriez blae tinz operations in the canyon and consequently a new one was the new bridge la feet lone with a roadway IS feet made of five inch plank sometime ago the commiel comm iee boners iet the contract 10 andrew bros for the construction ot a briare at weber abo length of which ia feet As a new bridge bad to be put in at the canyon or expensive repairs made ta the old une the old bridge was kiren to the andrew bros to be used MS one of the edans of the week weber bridee thus the cost of the new one to about 1100 |