Show must male schedule time amaba nov union pacific new fast train the overland limited has been making pretty fair time not withstanding the high winds and hot weather that have been encountered on the wyoming division during the past ten day the train has made on time each day since its inauguration and the officials of the passenger and operating departments are naturally highly pleased with the result the officials are not happy over the record made by the new fast mail that train winch formerly had the fastest schedule on the road has been increased in equipment until it is now the heaviest fast lone distance train in the country it usually has twelve to fourteen cars and never lees than eleven and has been given a lot of local work to do that was formerly done by another train still the officials have out atiat the old schedule should be made and they to have it done the train hr had a lot of trouble lately and has been laid out a number of times during the wind storm on sunday a heavy freight train was stalled bv the wind in coming down the steepest bill on the run in wyoming usually the traian have to come down the peru hill with all breaks beet but in this instance the wind was so revere that the train breaks off and a full head of steam on was unable to run down the hill trainmen cite this as an evidence of the folly of trying to keep up schedule time with the new feet mail under its new equipment thi 03 ciciala say that the train is billed to make alie time it is on the card and must be done if the crews have to be changed every run until men are found who can acet the work out of the machines that is in there is in them to yank the fast mail along on schedule time |