Show PIPE CONTRACT the Supe of or pipe laing la ing on the Is here jamea james barnee barnes who Is a to supervise the work of 0 laying the pipes tor for the ogden distributive water system arrived in thin this city cit yesterday morning bringing with w I 1 tit lint him ft a letter of 0 introduction tro to mr funge he ile wag was taken from st louin louis works now being beng reconstructed and tent sent ont out here to meet the demand for immediate construction he ile expected lo 10 find the pipe here but was dieto disappointed to d A A letter from the national tube works company states they last week shipped a whole train of pipe and on n the h they sent ten more carloads some of the pipe waa was expected in last night and on an monday mr funge will be ready with a force of men and teams warns to begin the immediate distribution of the pipe mr barnes Barries will will have charge of the entire work of the tube works company connected wib the tile hear bear kiver river canal company he ile is a man of exceptional exception at ability judging from bia his appearance and conversation and the large number of important works of w which I 1 ch be he has bad charge the workmen tor for laying the pipe have all fill been employed here and slid everything will ran along smoothly and successfully success lully |