Show TUB THE COMPLETED corey bros daie bale finished their work on the D R G western late wednesday Wed wednesday nesda y evening a train load of stock and men came in from the camps on the D it 0 G where corey brog bros have operated 0 for bior the past few months there were horses and about men the trai train a as first made up consisted of six cars care bat it was found too heavy and eleven where left at green river while the fifteen were taken in here these eleven arrived last night and another train which bad had been loaded during the previous day arrived late the contract just completed was as that of grading 63 miles of road from grand junction to rifle creek corey bros have taken the contract of 40 miles of work on the bear river canal fifteen miles of this work begins at the end of the garland contract a little above Ilam bridge and runs to point lookout the other 25 miles begin at the same point and branch out between the malad and bear rivers and ends west of corinne they are now shipping their men and tools there ther as fast as possible the present consignment n ment of men they will keep here a bayor day or two until their wagons arrive from the D li it a 0 camps |