OCR Text |
Show IRIVERDALE VIADUCT. Oar county commissioners have met every demand for money to pro mot the construction of thp River j dale viaduct and still there is a fail ure on the part of the ciate road commission to set under way The Riverdale viaduct was approved ' by the federal government as one of the projectR to help relieve the unem ploymcnt .situation and it now look: as though the work will be delayed until every other line of outdoor work j is resumed. The first report last summer was to ! ihe effect that 1500 was needed The Weber county commissioners paid the $300. Then il was stated larger, jsuui was required. The money was provided. Lately demand for $5000 , shas been presented and met Fiually when every possible call had been answered, the admission was made nhat the plaus and specifications were Uiolding up the job It may be that changing conditions , have forced modifications of the plans '.and that new problem0 hae caused unavoidable dcla 5 KoweTer, a little tanore life should be injected into this j Undertaking, or it will drag to an In ' definite length, no |