OCR Text |
Show START ON MOFFAT LINK IN 6 MONTHSH SALT LAKE. April -Lester l. Freed, director of the Salt Lake & Denvor Railroad company, said upon up-on his return to Salt Lake yesterday yester-day that tho construction of the Mot-fat Mot-fat road through from Denver to Salt Luke will be under way within six months. While In Denver he conferred con-ferred with various civic bodies, members Of the state legislature and others interested in the building of tho road and the measure that is now before the legislature for the construction of a slx-mllo tunnel. With the pusaKc of tho bill clearly clear-ly Indicated, the construction of the tunnel will be assured and work can be started from the Ftah end of the proposed line, which will Join the Moffat road now constructed as far as Craig. Coio. Thus the lon sought aim of a railroad through the Uintah basin and of a shorter and easier K railroad link .-onnecUoaW ! Denver and Salt La) &nM realization. |