OCR Text |
Show oo TWENTY-FOURTH HILL TO 8E COVERED III TUMI Improvement of traffic conditions on the Twenty-fourth Btreot hill, betwoon Washington and Adams avenue, is to be made immediately. Commissioner Chris Flygaro having made arrangements arrange-ments to have a new coat of tarvia placed on this roadway. This hill has proved one of tho real problems for municipal upkeep, particularly parti-cularly becauso of tho heavy flow of storm water from the "bench" to the business district, flooding tho thoroughfare. thor-oughfare. Tarvia is -considered by tho commissioners to be the best material for holding tha macadam pavement on this roadway, Baving it from washing. Eventually the paving of tho hill is anticipated. There is now paving on the Twenty-sixth and Twenty-seventh street bills' with work of a similar nature manned for tho Twenty-second, Twenty, Twen-ty, third and Twenty-eighth street grades. |