Show NO SANITARY RESERVOIR FOR OGDEN We Ve learn the city authorities have havo changed their plans in the build building InS ing of oC the new reservoir for the city wa of making a pond the excavation Is t J remain without concrete floor or sides When the city came Into possession of the there was a prom promIse Ise made by some one that a be built and there was talk of commencing the tho work worle on the reservoir prior to the date of trans transfer I fer of the s system stem so urgent was time the demand for a clean reservoir r The Tho change of front on the part ot or Uw Urn city administration Is without ex cx explanation With the tho large revenue I which we are wId Is pouring In to the city tt treasury asur there should lie bc little or 01 orno I Ino no excuse for tor failing to give Ogden Ogdena a water somewhat better tItan than that which Is drawn from a mud jond |