Show j jUNION UNION PACIFIC PLANS TO TORUN TORUN RUN TRAINS INTO SEATTLE Portland Ore July DI DIrector Director rector J C Stubbs of the tho Harriman sy system tom who arrived here horo today lodar said tonight that the tho Union Pacific hopes to have Its trains running Into within two months Mr Stubbs said that n a temporary agreement had bad been reached between the H Harriman and Hill Hili lines JInes and that preliminary details had been boen arranged by which the Union Pacific will enter Tacoma over oer the Northern P Pacific tracks from tills lIlls city The Oregon and Washington railway tunnel he said will not be completed fo for a year ear The tunnel Is between South Tacoma and Tacoma and in inI r I the tho meantime Sold said Mr 11 Stubbs those thore I I would woud be an arrangement where whereby y the tho Union Pacific will use the tho North Northern ern Pacific depot at Tacoma and Northern Pacific track out or of Ta Tacoma I coma |