Show I CROSS ARMS TO BE AT TOP Washington avenues avenue's new Dew paved cd surface was opened to traffic Sun Sun- Sunday day The entire paving pa work has been completed by the Wheelwright Construction company the contractors tore tors After the laying of or the last last foot on Washington avenue some patching work was done along street streetcar st streetcar t car tracks at street Intersections Attention is being turned to the Installation of the white lUte way light light- lighting lighting ing log system and the placing of elec dee electrical electrical wires underground Decision has been made me-de that the ornamental cross arms each containing two large lights tights will nill be placed at the top of poles along the street Two models were placed place in front of ot the city hall halla a a. few days ago one with the cross cross- arm at the top and another with the lights several feet f t down It Is believed by choosing the model with the cross arm at the top that better lighting will result The new ornamental cross arms arc are areto to be installed on the poles now at atthe atthe atthe the and the lights formerly used on tho the poles wilt will be removed |