Show ROCK FOR ROAD BEING PILED UP f. f Crushers Operating on Portion of to toBe toBe Be Oiled Oile I Special Correspondence BRIGHAM City July 11 Division iL-Division Division Engineer K C C. Wright on his re return re- re return turn irons from Sardine canyon reports two large rock crushers cru hers are lire being operated steadily preparing for oiling of the highway This Thi Is Ia a federal aid project The large oiling machine that Is now being operated operate In Provo canyon Is 13 expected to be on the Sardine canyon project by about the first of August Before B fore that time there are abot about yards of gravel graveland granland graveland and rock to to be crushed and placed in readiness This morning another huge rock crusher that has just been b en completed was put In operation mak male making makIng ing log three crushers Each plant will wilt willbe be operated with about 5 or 6 men and teams Mr Mc Wright V said that with wilh this force working he does docs not expect any delays when the oiling machine arrives He added that he does not think It will be necessary to traffic around by Collinston as was as asI thought bought at first as liS the road will wUl be treated for one half of its width at ata a time This will permit the other oth r I halt half to be used with care by motor motor- lots 15 |