Show ROAD ENGINEERS SEE BUILDING JOBS c C. W. W Cross senior highway engineer of 0 the United States bureau of public roads who re- re returned returned turned Sunday from Idaho re- re reports reports ports that ork has been started by the contractors on the paved road front Pocatello toward American Falls II a distance of 0 sev- sev seven en miles Surfacing of the road between Wendell and Jerome 15 under way ay and Is expected to be completed d by JUly 1 Work ork has also been started on th the Glenns Ferry road which will eliminate a a. bad condition along the railroad tracks Joseph IL Young senior high high- highway highway way engineer who has returned from the southern part of 0 Utah says sas the state Is surveying a line from Cisco to the Colorado line a a. distance of seven n miles and will underpass the Denver Rio Grande Western Vestern railroad a mlle mile east cast of Cisco Another survey Is being made b by the tho state Irons from Santa Clara to pass through the Shew Its Indian In- In Indian dian reservation The road now being built front nock flocks Ille west cst to Balton Wash ash must be completed ed before the tourist rush to Zion national park and good progress Is reported by Mr Ir Young With the exception of 0 the lining or of It a tunnel with timber the road front St St. George to bench Is completed Tints This Is the only tunnel on the state high high- da day system York Work has been resumed on the detour delour road to ned fled Marrow In Spanish Fork canyon canon |