Show REACH POINT FOR LAST LAST BORE BLAST ByThe DE DENVER ER Colo Feb Dy 12 12 The Associated Workers Press Presa In the pioneer bore of ot the Moffat tunnEl have kept their date with President for tor the final ceremonies In connection with the holing through ot of the tunnel on February 18 Early today a 0 drill operates operate 1 by byone byone byone one of ot the crews reached a point where the last blast that which will be set oft off when the president lent touches a key at Washington at p m next Friday will break breakdown breakdown down the last barrier and complete one ot of the tho greatest engineering en feats of ot Its kin kind I in the history ot of I this country that ot of o penetrating the continental divide Work York on the tho main bore of ot rail rail- railroad railroad rail railroad road tunnel is progressing rapidly and officials ot of the project are confident that trains will be ing operating through tho the mountain early In July |