Show 00 oo- oo CAMP CAMP- INSTALLED FOR SECOND WELL MOAB Jan 30 Location 30 Location No 1 on the Shafer structure Is rap rap- rap idly rapidly assuming the appearance of ot on a anoil oil camp The camp houses havo been constructed and the work ot of erecting the derrick will probably start stort within ten days das The ten Inch pipe in the Mid Mid- Mid west Utah Southern well welt has hai ha been to the bottom and lande landed l on the caprock at 2028 2023 feet teet Today cementing will viii begin and after the cement has been allowed to set for seven seten days the oil sands will be drilled In In |