| Show MAKING MASING STUDY OF I LOGAN POWER SITE LOGAN May P 21 21 F A Daney a lo local loca contractor has bas received receive from Mayor John A Crockett worth of bonds bondA tor for Sewer District No 8 Mayor Crockett announces that members of or the city engineering department nt are ar working at the tho site of or the new power plant in an effort to 10 deter deter- determine determine mine the tho fall tall from front the crest of ot the present dam to the intake of the th city water flume with the Idea or of deciding upon the height for Cor the they I new dam dam- He lie states tatt's that each ad- ad toot root In height win will produce 17 additional units of at horsepower er Bids on the pipe piP line and new machinery for tor the tho plant will bo be called for as ns soon as preliminary arrangements can enn bo be m mide de on |