| Show II I BREAKING I OF STATE ROAD I Deciding that a part patt part ot of the hard surfaced road ro between Ogden and Sa Sat Salt t Lake has broken do down n to the point ft pt disintegration which calls tor for quick action the state road roa commission has started out to at- at at attempt tempt to savo saw the concrete pave i by adding a surface of ot as asphalt asphalt Four Pour miles ot or highway between and Layton Laton La ton li is to be re- re recOnstructed re reconstructed constructed by a three toot slab Blab 0 of cement concrete eight Inch Inches thick on each side Bide These slabs will be two inches above the present sur sur- surface surface face tace of the roadway and the trough created will be tilled filled In Ith sheet asphalt or ma- ma material ma A decision in connection with the reconstruction which v a atU W appeal to te the auto owners ot la to that the tm- tm Im Improvements are to bo be made with w without th- th oa out t detours The recollections ot of the detours during the construction period of o the highway have been nIghtmares to more than one of oC a car |