Show OIL DRillERS TO USE BARGE Heavy Equipment Will WillI WillBe I Be Freighted Down I River I MOAB JOn Jan The 26 26 The timber lumber for tor the construction of a abarge barge 45 feet long with 1 beam of 16 feet have havo been beon ered at atthe the bank of o tho Colorado rh er jutt below the steel bridge three north of Moab The Moab I Garnge company compan builders and owners of o the bUge have the con contract tract to move ton of equip equipment I ment including an foot 84 derrick an and all other merit ment to th site of tho John L No 1 test teet oil well to be drilled by tho Midwest est company In the tho canon can on of Colorado river 18 miles d downstream 1 n from Moab Tho craft w ll e under Its own poel w ll a capacity of ten ton tons an hen fully loaded will 11 draw but Inches of water work h has been commenced on tho banks of the tho river for the con con con- of a 0 permanent to loading of the tho barge barer |